 |
JSC"TGC-5" consists of 4 branches (Kirov, Udmurt, Chuvash, Mariy) including 11 power plants.
Installed capacity of TGC-5: - electricity: 2.467 MW - heat 9,040 Gcal/h
Generation in 2007 of - electricity 11.0 billion kW/h - heat 16.4 million Gcal
Аnnual fuel consumption in 2007 - 5 million 265 thousand rft - Gas - 4,797 thousand rft - Coal - 323 thousand rft - Residual fuel - 128 thousand rft - Peat - 17 thousand rft
Basic Activity: electricty and heat generation Presentation about company |